2022-23-24 The Club entered into an agreement with the Municipality of East Ferris to increase the parking space and double the launch and docking facilities at the South Shore Launch on Lake Nosbonsing. With the help of Municipal Planner Greg Kirton the permits from MNRF, NBMCA, and Oceans and Fisheries were obtained. The Municipal Engineer Antoine Boucher lined up the road crew and equipment.
Removing the trees and stumps, filling and grading the parking lot. Also a newly paved apron on the entrance to South Shore Road
Club members doing the form work and prep for the first 6 of 12 concrete pads.
The first 6 concrete pads are stacked and ready to go. Re-prepping the forms and pouring the remaining 6 concrete pads.
Moving day ! The crane from Mammoet lifts the concrete pads into the water with help from Municipal crew and equipment.
The finishing touches will be done in the spring to prepare for the official grand opening.